01 / Capture
Evidence at the material handoff.
GPS-aware photos, timestamped weighbridge readings, and short processing records connect material movement to a specific batch.
Verification infrastructure for India's EPR ecosystem
TraceLot gives PROs and certificate aggregators a reviewable record behind recycler claims, before recycled volume is relied on for EPR compliance.
Trace ID
TL-EPR-26-0418
Evidence coverage
94%
Required checkpoints submitted and reconciled for pilot review.
Illustrative certificate record. Not a live compliance decision.
Built for accountability at scale.
A certificate is only as reliable as the evidence beneath it. TraceLot brings field records, operational signals, and reviewer judgment into one traceable decision record.
A verification workflow
01 / Capture
GPS-aware photos, timestamped weighbridge readings, and short processing records connect material movement to a specific batch.
02 / Reconcile
The review brings together material purchase records, e-way bill references, capacity indicators, and facility history.
03 / Review
When a signal needs context, TraceLot preserves the reason for review, requested clarification, evidence response, and final outcome with the certificate record.
Product demonstration
This illustrative interface shows the practical review sequence a PRO team can use for a certificate batch.
Illustrative review workspace
Batch: TL-EPR-26-0418
Evidence trail
Collection logged
Location record, 12:14 IST
Weighbridge reading attached
Gross and tare image, 18.4 t
Capacity signal requires context
Throughput differs from facility baseline
Anomaly review
OpenReview signals invite clarification. They do not determine fraud automatically.
Pilot intake
We will scope the first facility, certificate volume, and evidence checkpoints around your operating process.
Questions, answered